C/sells

Work Packages

To realise a decentralised large-scale project like C/sells an effective structuring is needed. This structure assigns the workload to the different parties involved while enabling decentralised action as every work package operates autonomously. To reconcile the results and to synchronize all activities the heads of the working packages, the subprojects and the overall project management are in constant exchange with each other. Below you can find the subprojects and the respective work packages.

SUBPROJECT SP 1

Project management

The project management takes care of an efficient cooperation of all project partners and the external presentation of the project.

SUBPROJECT SP 2

Project setting construction

The project setting construction is the interface between the holistic examination of the project and the activities of the many participating parties.

SUBPROJECT SP 3

Infrastructure information system (IIS)

SP 3 works on the definition of requirements, components and structures of a IIS in a cellular surrounding integrating all existing and planned system elements. 

SUBPROJECT SP 4

Smart Grid coordination and organisation

SP 4 develops automatic mechanisms in the operational management of smart energy networks following the expansion of renewable energies and the accompanying volatile exposure of distribution and transmission grids.

SUBPROJECT SP 5

Methods for intelligent properties and markets

SP 5 aims at methodically investigating the conditions of the participation of the properties in the grid market. This includes an economical analysis of the cells operations and of properties in various cases and in different levels of detail.

SUBPROJECT SP 6

Demonstration of cellular smart grids

The different C/sells demonstration projects are based on Business Use Cases developed by the SPs 3, 4 and 5. These Business Use Cases will be implemented according to the preparatory work. SP 6 tests the obtained results by putting them in practical use.

SUBPROJECT SP 7

Prosumer solutions for properties

The basic idea behind C/sells is the cell: Each working group can act self-contained and is able to interact with the other cells as well as to activate superordinate cells. SP 7 tests the suitability of the cellular approach for the requirements of the grid as well as for needs of the customers.

 

Practical examples of application

  1. Regional markets of flexibility
  2. Blue Franklin Village
  3. FZI Living Labs
  4. Zero Plus
  5. Stuttgart airport
  6. Ehoch4
  7. Reality-Laboratory Ulm
  8. Intelligent thermal energy Munich
  9. Intelligent Flexibility-Incentives Eastern Bavaria

C/sells Social Web